[ad_1] Describe the purpose of a job analysis and its main elements. Then write a job description for your current or a previous position that you have held by conducting a blended job analysis. First, identify your tasks and duties,
Operations Research Batching
[ad_1] You have a two step process for manufacturing tools. The first step is fabrication operation which requires a set-up. The setup time is 15 minutes and the nominal processing time is 0.5 minutes per part. The second process is
industrial engineering
[ad_1] A line consists of 2 machines in series with an infinite buffer between the machines. The raw processing rate of each machine is 1 part per minute. If the availability of machine 1 is 0.95 and the availability of