[ad_1]

 Consider the following scenario: You are the safety manager for a team that is working to complete a 10-story addition to a hospital. The framework of the addition will be steel and concrete. The floors will be formed and poured with reinforced concrete on metal decking. The outside will require brick and glass window installation and installation of a standing seam metal roof. The interior will consist of metal stud framing with drywall and tile floors. The building will be centrally cooled and heated with a heating, ventilation, and air condition (HVAC) mechanical system, and it will need a new electrical supply source.

[ad_2]

site-specific safety program
Tagged on:     
We have updated our contact contact information. Text Us Or WhatsApp Us+1-(309) 295-6991