[ad_1]

 You have a two step process for manufacturing tools. The first step is  fabrication operation which requires a set-up. The setup time is 15  minutes and the nominal processing time is 0.5 minutes per part. The  second process is a batch furnace. The nominal heat treatment time is 2  hours and the furnace can process a maximum of 100 parts per run.  However the furnace also breaks down with a mean time to fail of 4 hrs  and mean time to repair of 0.5 hrs. The repair time has an exponential  distribution. Assuming that the transfer lot size is same the process  batch size, and the required production rate is 30 parts per hour with  arrival SCV of 1 to the first step, determine the following: 

[ad_2]

Operations Research Batching