[ad_1]
You are a developer interested in building a 12-story office building in Louisville, KY. The project will be constructed using the traditional project delivery method (Design Bid Build). Based on the AIA contract documents synopses (attached), AIA A101 is the correct document to adopt for the Standard Form of Agreement between Owner and Contractor.You have been provided with the AIA A101: Standard Form of Agreement between Owner and Contractor (where the basis of payment is a Stipulated Sum). Your assignment is:
[ad_2]
AIA from